NIAB 1 (DARWIN GREEN 1): S/0247/14/DC

This application is for discharge of planning conditions relating to S/0001/07/F for Darwin Green 1, which approved the formation of vehicular, pedestrian and cycleway access road from Histon Road to serve the urban extension of the city between Huntingdon Road and Histon Road, Cambridge, together with drainage and landscaping Works.

The conditions this application relates to include:

  • Condition 3 - Hard and Soft Landscape Works
  • Condition 5 - Landscape Maintenance and Management Plan
  • Condition 7 - Scheme for the Provision and Implementation of Pollution Control of the Water Environment
  • Condition 8 - Ecological Management Plan
  • Condition 9 - Construction Management Plan
  • Condition 12 - Levels of Road and Associated Structures
  • Condition 13 - Soil and Contamination
  • Condition 14 - Archaeology
  • Condition 17 - Detailed Waste Management Plan

Condition 6 - Detailed Surface Water Drainage is a separate application ref. S/0204/14/DC.

The documents relating to the above details can be accessed here. Please ask us if you require these documents on CD-ROM.

Condition 3 - Hard and Soft Landscape Works

Covering letter

628.2-108 Rev D Attenuated Landscape Sheet 01 (of 02) A0

628.2-109 Rev E Attenuated Landscape Sheet 02 (of 02) A0

628.2-208 Rev C Attenuated Landscape PP Sheet 01 (of 02) A0

628.2-208 Rev C Attenuated Landscape PP Sheet 01 (of 02) A0

628.2-209 Rev D Attenuated Landscape PP Sheet 02 (of 02) A0

628.2-209 Rev D Attenuated Landscape PP Sheet 02 (of 02) A0

628.2-300-Rev F Typical Landscape Details

Design Code Compliance Statement 140115

 

Condition 5 - Landscape Maintenance and Management Plan

628.2 RPT03 - Rev C - Landscape Management and Maintenance Plan (SCDC) binder

 

Condition 7 - Scheme for the Provision and Implementation of Pollution Control of the Water Environment

B11005IDB - Condition 7 Pollution Control November 2013

 

Condition 8 - Ecological Management Plan

AEL0635_SCDC Ecological MP V3 0 20131023

 

Condition 9 - Construction Management Plan

DG SCDC Construction management plan December 2013

Appendix A Vehicle routes for major deliveries

Appendix B Traffic management plan TMP01

Appendix C Examples of site specific safety board

Appendix D Drive in Drive out Wheel wash

Appendix E Construction Sign Pack

Appendix F Standard Site Compound

Appendix G The control of dust and emissions

Appendix H Risk assessment for mortar silos

Appendix I Light Pollution

Appendix J Health and Safety in construction

Appendix K Protecting The Public

Appendix L CC Code of Practice

Appendix M Guidance for Mobile Crushing and Screening

Appendix N Detailed waste management plan

 

Condition 12 - Levels of Road and Associated Structures

B11129IDB-Condition 12 Road levels November 2013

 

Condition 13 - Soil and Contamination

Main Site Investigation_Part 1

Main Site Investigation_Part 2

Main Site Investigation_Part 3

Main Site Investigation_Part 4

Main Site Investigation_Part 5

25459-02R(00) Supplementary Investigation

25459-R03 (00) Summary Geo Environmental Report

 

Condition 14 - Archaeology

Archaeology Albion PD 2012-57 version 1.3

 Condition 17 - Detailed Waste Management Plan

Appendix N - Detailed waste management plan