NIAB 1 (DARWIN GREEN 1): S/0247/14/DC
This application is for discharge of planning conditions relating to S/0001/07/F for Darwin Green 1, which approved the formation of vehicular, pedestrian and cycleway access road from Histon Road to serve the urban extension of the city between Huntingdon Road and Histon Road, Cambridge, together with drainage and landscaping Works.
The conditions this application relates to include:
- Condition 3 - Hard and Soft Landscape Works
- Condition 5 - Landscape Maintenance and Management Plan
- Condition 7 - Scheme for the Provision and Implementation of Pollution Control of the Water Environment
- Condition 8 - Ecological Management Plan
- Condition 9 - Construction Management Plan
- Condition 12 - Levels of Road and Associated Structures
- Condition 13 - Soil and Contamination
- Condition 14 - Archaeology
- Condition 17 - Detailed Waste Management Plan
Condition 6 - Detailed Surface Water Drainage is a separate application ref. S/0204/14/DC.
The documents relating to the above details can be accessed here. Please ask us if you require these documents on CD-ROM.
Condition 3 - Hard and Soft Landscape Works
628.2-108 Rev D Attenuated Landscape Sheet 01 (of 02) A0
628.2-109 Rev E Attenuated Landscape Sheet 02 (of 02) A0
628.2-208 Rev C Attenuated Landscape PP Sheet 01 (of 02) A0
628.2-208 Rev C Attenuated Landscape PP Sheet 01 (of 02) A0
628.2-209 Rev D Attenuated Landscape PP Sheet 02 (of 02) A0
628.2-209 Rev D Attenuated Landscape PP Sheet 02 (of 02) A0
628.2-300-Rev F Typical Landscape Details
Design Code Compliance Statement 140115
Condition 5 - Landscape Maintenance and Management Plan
628.2 RPT03 - Rev C - Landscape Management and Maintenance Plan (SCDC) binder
Condition 7 - Scheme for the Provision and Implementation of Pollution Control of the Water Environment
B11005IDB - Condition 7 Pollution Control November 2013
Condition 8 - Ecological Management Plan
AEL0635_SCDC Ecological MP V3 0 20131023
Condition 9 - Construction Management Plan
DG SCDC Construction management plan December 2013
Appendix A Vehicle routes for major deliveries
Appendix B Traffic management plan TMP01
Appendix C Examples of site specific safety board
Appendix D Drive in Drive out Wheel wash
Appendix E Construction Sign Pack
Appendix F Standard Site Compound
Appendix G The control of dust and emissions
Appendix H Risk assessment for mortar silos
Appendix J Health and Safety in construction
Appendix K Protecting The Public
Appendix L CC Code of Practice
Appendix M Guidance for Mobile Crushing and Screening
Appendix N Detailed waste management plan
Condition 12 - Levels of Road and Associated Structures
B11129IDB-Condition 12 Road levels November 2013
Condition 13 - Soil and Contamination
Main Site Investigation_Part 1
Main Site Investigation_Part 2
Main Site Investigation_Part 3
Main Site Investigation_Part 4
Main Site Investigation_Part 5
25459-02R(00) Supplementary Investigation
25459-R03 (00) Summary Geo Environmental Report
Condition 14 - Archaeology
Archaeology Albion PD 2012-57 version 1.3
Condition 17 - Detailed Waste Management Plan
Appendix N - Detailed waste management plan